Nahuel Acosta Martinez
Perth, WA
“This is a great construction company, and I trust them completely. Tom is always communicative and professional, and his experience really shows in the quality of his work. Highly recommended.”
Google Review

From a straightforward refresh to a full wet-area rebuild, we renovate bathrooms and ensuites across Perth's western suburbs with transparent, disclosed pricing and waterproofing to Australian standard.
Get an instant indicative estimate for your project. Cost of works and our disclosed management fee are shown separately, consistent with your formal quote. All prices include GST.
Estimating wet areas only. Need a different project type? Try the full calculator.
Choose Project Type
Scope
Finish Level
Optional Add-ons
Your Estimate
🛁Bathroom
Estimated Cost of Works
$20,400
Materials, labour and subcontractors only — our management fee is shown separately below.
Low
$15,300
High
$25,500
Email Me This Estimate
Get this exact breakdown sent to you in the next minute — no phone call required.
No spam — just your estimate and a follow-up from our team. By continuing, you agree to our Privacy Policy.
Estimates are indicative only. Cost of works excludes our locked, disclosed 18.5% management fee, shown separately above. Final pricing requires a formal site-specific quote from our team.
Bathrooms reward getting the details right the first time — proper waterproofing, done to AS 3740, protects your home for decades. We treat it as a core standard on every job, not a line item you're upsold on.
As a licensed builder we manage plumbing, electrical, tiling and waterproofing under one roof, with every cost disclosed and one flat, locked management fee — no separate margin from a bathroom-only subcontractor stacked on top.

5.0 stars across 19 Google reviews. Rotating through real client feedback below — see the full set on Google.
Read All Google ReviewsOur management fee is locked and disclosed before work starts, so we're financially committed to your build the same way on day one as on day one hundred — steady quality and pace, first brick to handover.
You see the real cost of your build and exactly what our fee covers, every time.
Scope changes are billed at the real invoiced cost with the same disclosed fee added — what you see is what you pay, every time.
Change finishes or scope mid-build and your fee structure stays exactly the same.
A basic renovation with a budget fit-out typically runs $10,000–$18,000. A mid-range renovation with better tiles, a new vanity and updated fixtures lands around $18,000–$30,000. A high-end renovation with premium fixtures, in-floor heating and a frameless shower screen is $30,000–$55,000+. Use the estimator below for an indicative figure, or get a free, site-specific quote.
Yes — all wet-area work is waterproofed to AS 3740, WA's legal standard for domestic wet areas, as a matter of course, not an upsell. As part of a full renovation, waterproofing typically runs $800–$1,800 for a standard bathroom (more for larger or complex layouts), and it's the one place we won't cut corners — waterproofing failures often stay hidden until there's structural damage behind the wall, which costs far more to fix than to do properly the first time.
Yes — keeping existing plumbing positions rather than relocating them can save roughly $1,500–$4,000 depending on the layout. We'll always tell you honestly whether a reposition is worth the cost or whether the existing layout already works.
Yes, we regularly run these as a combined project — it's often more cost-effective to renovate both at once given shared trade mobilisation (plumber, tiler, electrician) rather than staggering them separately.
Older homes in Perth's western suburbs — particularly pre-1990 builds — sometimes have asbestos sheeting behind tiles or under old flooring. We test for this during the site assessment and, if present, arrange safe, licensed removal as a budgeted part of the project rather than a surprise mid-renovation.
You see the real, invoiced cost of materials and trades, plus one flat, locked management fee agreed before work starts — the same rate regardless of project size, with no separate margin hidden inside supplier quotes.
A standard bathroom renovation typically takes 3-5 weeks from demolition to handover, depending on tile and fixture lead times. Larger renovations with structural or layout changes can run 6-8 weeks.
Yes — it's free, gives an instant indicative estimate, and you don't need to submit any details unless you want a formal, site-specific quote afterward.
It's a genuine indicative range based on real Perth renovation rates for finish level, not a marketing number. Your exact cost depends on your existing bathroom, waterproofing needs and chosen fixtures, confirmed during a free assessment.
If your final cost tracks more than 10% above our upfront estimate, we'll automatically bring in our in-house experts for a free consultation — reviewing where costs are tracking over and identifying options to bring your build back on budget. No extra charge, and we act on it proactively, before you have to ask.
No pressure, no obligation — tell us a bit about your bathroom and we'll come back with honest advice, whether it's a standard refresh or a full wet-area rebuild.
Financing your project? Ask us about staged payment structures aligned to build milestones — we're happy to talk through options.
Based in Subiaco, working across the western suburbs including Shenton Park, Daglish, Jolimont, Karrakatta, Nedlands, Claremont and the wider Perth metro area.